Quick answer: Trash collection time equals the number of bins times the minutes to empty and reline each one, plus the number of trips to the dumpster times minutes per trip. 80 bins at 0.8 minutes each plus 5 trips of 6 minutes takes 94 minutes, about 1.57 labor-hours, per visit.
Why does trash time get underestimated?
Each bin takes under a minute, so trash looks too small to count. But 80 bins a night, five nights a week, adds up to nearly eight labor-hours a week, and separate recycling and compost bins can double the count. Leaving trash out of an estimate shortens every schedule.
How do you estimate trash labor?
Step 1. Count bins
Count every bin the crew empties, including recycling and compost streams.
Step 2. Time a bin
Time emptying and relining a typical bin with liners pre-loaded on the cart.
Step 3. Count and time hauling trips
Count trips to the dumpster, compactor or dock per visit, including elevator waits.
Step 4. Calculate
Minutes = bins × minutes per bin + trips × minutes per trip. Divide by 60 for hours.
Example
Sample figures only.
| Item | Minutes |
|---|---|
| 80 bins × 0.8 min | 64 |
| 5 trips × 6 min | 30 |
| Per visit | 94 (1.57 hours) |
| Weekly, 5 visits | 7.83 hours |
How do you cut trash time?
Central waste stations instead of desk-side bins cut the bin count most. Larger carts reduce trips. Reusing liners in bins that hold only dry paper saves time and liners. Rerun the estimate with the new bin count to show the saving before you propose the change.
Estimate your trash labor
Use the Trash Collection Labor Calculator.
Related: How to Calculate Trash Liner Orders
Make the numbers easier
Explore free calculators for cleaning time, staffing, bids and supplies.
Browse calculators