Price rough clean, final clean and touch-up as one project bid.
This calculator requires JavaScript. Please enable JavaScript to perform calculations locally in your browser.
Quick answer. Post-construction bid = (rough + final + touch-up labor-hours × loaded labor rate + materials and disposal + equipment and transport) ÷ (1 − target margin %). The example job, 50 labor-hours at $28 with $430 of materials and equipment, prices at $2,440 at a 25% margin.
Where these bids go wrong. Bidders price the final clean they can picture and forget the other two phases. The rough clean removes debris and heavy dust before flooring and fixtures go in. The touch-up comes after the punch list, when trades have walked through again. Each phase needs a return trip, and the touch-up often happens on short notice.
What to enter
- Rough-clean labor-hours. Debris removal, sweeping, initial dust.
- Final-clean labor-hours. Detailed cleaning of every surface, fixtures, glass, floors.
- Touch-up labor-hours. Return visit before handover or inspection.
- Loaded labor rate.
- Materials and disposal. Chemicals, razor blades, bags, dumpster or haul-away fees.
- Equipment and transport. Lifts, ladders, HEPA vacuums, trailer, fuel.
- Target gross margin %.
How the calculation works
- Total hours = rough + final + touch-up
- Cost = hours × labor rate + materials/disposal + equipment/transport
- Bid = cost ÷ (1 − margin ÷ 100)
Worked example. 18 + 24 + 8 = 50 labor-hours at $28 is $1,400. Add $250 materials and disposal and $180 equipment and transport for $1,830 of cost. At 25% margin the bid is $2,440, with $610 gross profit.
Before you rely on the number. Visit the site. Construction dust, adhesive and paint overspray vary from job to job. Check whether the GC needs your certificate of insurance, lift certifications or specific safety training, and whether waiting time between trades is billable.
Frequently asked questions
How do you bid a post-construction cleaning job?
Estimate labor-hours for each of the three phases (rough clean, final clean and touch-up), multiply by your loaded labor rate, then add materials, disposal, equipment and transport. Divide the total cost by one minus your target margin. A job with 50 total labor-hours at $28 an hour, $250 of materials and disposal, and $180 of equipment and transport costs $1,830, and at a 25% margin the bid is $2,440. Visit the site before bidding, because the amount of dust, adhesive, paint overspray and debris varies a lot between projects. Photograph the site during the walk so you can check your estimate later.
What is the difference between rough, final and touch-up cleaning?
Rough cleaning happens while construction is still active: removing debris, sweeping and vacuuming heavy dust, and clearing areas so trades can finish. Final cleaning comes when construction is complete: detailed cleaning of fixtures, cabinets, windows, sills, floors, vents and every surface, plus removal of stickers and residue. Touch-up, sometimes called the punch clean, is a return visit after the final walkthrough or after trades fix punch-list items, so the space is ready for handover or move-in. Each phase is a separate trip, and many bids lose money by pricing only the final clean. Price each phase separately so the GC sees what each one costs.
How much does post-construction cleaning cost per square foot?
Post-construction cleaning prices per square foot vary with the project type, the amount of debris, the number of windows and fixtures, and whether all three phases are included. Commercial build-outs with lots of glass and fixtures cost more per square foot than an empty warehouse shell. Instead of copying a per-square-foot rate, estimate hours per phase for this project and calculate the price. Then divide the bid by the square footage if the GC asks for a per-square-foot figure. That way your rate reflects the actual project, not an average from unrelated jobs. Keep the per-square-foot figure as a check, not as the basis of the bid.
How many labor-hours does a final construction clean take?
Final-clean hours depend on square footage, the number of windows, doors and fixtures, cabinetry, flooring type, and how much dust and residue the trades left. A good way to estimate is to break the space into rooms, estimate minutes per room type from past jobs, and add time for glass, high surfaces and floors. Track actual hours on every construction clean you do, by phase and by building type. After several jobs you will have your own rates per square foot for each phase, which make future bids faster and more accurate. Phase-by-phase records also help when a GC asks you to explain a bid.
What should be included in materials and disposal?
Include chemicals such as adhesive removers and glass cleaners, razor scrapers and blades, microfiber, mop heads, vacuum bags and HEPA filters, trash bags, protective coverings, and personal protective equipment. Disposal covers dumpster rental or haul-away fees if you remove debris, plus dump fees. Many contracts make the general contractor responsible for construction debris and dumpsters, so check before adding them. If you must handle hazardous materials such as some paints or solvents, local rules apply and the cost goes up. Clarify debris responsibility in writing before submitting the bid. List every item you are not supplying in the exclusions section.
Do I need special equipment for post-construction cleaning?
Often, yes. Common equipment includes HEPA vacuums for fine construction dust, extension poles and ladders, scissor or boom lifts for high windows and fixtures, floor scrubbers or burnishers, and sometimes pressure washers for exterior concrete. Lifts may require operator training under OSHA rules for aerial lifts. Rental equipment cost goes into the equipment and transport field. If you own the equipment, use the Cleaning Equipment Cost Per Hour Calculator to find a fair hourly charge, then multiply by the hours the equipment will run on this job. Confirm that lift operators hold current training before the job starts.
What margin should I use for post-construction cleaning?
Post-construction work carries more risk than recurring cleaning: schedules change, trades leave more mess than expected, and touch-ups can repeat. Many contractors therefore use a higher target margin on construction cleans than on routine janitorial contracts. The right level depends on how competitive bidding is in your market and how well you know the GC. Running the calculator at two or three margins shows the price range. If a GC pushes on price, reduce scope or clarify exclusions rather than cutting margin on a job with unknowns. Record the margin you used on each job so you can compare results.
Should waiting time between trades be included in the bid?
Decide this before bidding and state it in writing. On many projects, cleaners arrive and find that painters, electricians or flooring crews are still working, which leaves the cleaning crew waiting or forces a return trip. You can include an allowance for one extra trip in the touch-up hours, or state that additional trips caused by schedule changes will be billed at an hourly rate. Clear terms protect your margin. GCs generally understand trip charges when the bid states the conditions up front. Without written terms, extra trips usually end up unpaid. Include the hourly rate for extra visits in the bid itself.
What documents do general contractors usually ask cleaning subcontractors for?
General contractors in the US commonly ask cleaning subcontractors for a certificate of insurance naming the GC as additional insured, proof of workers’ compensation coverage, a W-9, and sometimes a signed subcontract with safety requirements. Larger projects may require site-specific safety orientation, OSHA training records, background checks for certain buildings, and lien waivers with each invoice. These requirements cost time and sometimes money, such as higher insurance limits. Add those costs to your overhead or to the materials line so they are covered in the bid rather than discovered after you win it. Keep current copies in one folder so you can respond to bid invitations quickly.
Can this calculator price residential new-construction cleans?
Yes. Residential new-construction cleaning follows the same three-phase pattern, and builders often order rough and final cleans for each home. Enter the hours per phase for one house, your labor rate, materials and transport. If a builder orders the same floor plan repeatedly, track actual hours on the first few homes and use them to set a fixed price per plan. Transport costs matter more on residential jobs spread across subdivisions, so consider the Cleaning Route Travel Cost Calculator when you service several homes in different neighborhoods on the same day. Tracking hours per plan tightens future prices.