Measure panes per hour on a real job, then forecast the next one.
This calculator requires JavaScript. Please enable JavaScript to perform calculations locally in your browser.
Quick answer. Panes per labor-hour = panes cleaned ÷ (workers × hours each). Hours for the next job = panes in next job ÷ rate. Two workers cleaning 120 panes in 3 hours each is 20 panes per labor-hour; a 350-pane job would take 17.5 labor-hours.
Your rate, your jobs. A rate measured on a storefront route won’t predict a two-story office with screens. Record rates by building type and method, and forecast only between similar jobs.
What to enter
- Panes cleaned.
- Workers on job.
- Hours per worker.
- Panes in next job.
How the calculation works
- Person-hours = workers × hours
- Rate = panes ÷ person-hours
- Next job hours = next panes ÷ rate
Worked example. 20 panes per labor-hour; 17.50 hours for 350 panes.
Before you rely on the number. The rate includes whatever was in the measured hours: setup, travel on site, breaks. Measure the same way every time.
Frequently asked questions
How many windows can a window cleaner clean per hour?
It depends on pane size, height, soil, access and method. A cleaner on easy ground-floor storefront glass may clean many panes an hour, while second-story windows with screens and ladders take far longer per pane. In this example, two workers cleaned 120 panes in three hours each, a rate of 20 panes per labor-hour. Measure your own crew on each type of job and keep the rates on record. Your measured rate is the most reliable figure for forecasting labor-hours and pricing future work. Record weather with each rate, since cold or wet days slow work.
How do I measure my window cleaning production rate?
Record the number of panes cleaned, the number of workers, and the hours each worked on the job. Divide panes by total person-hours. Decide what time to include, such as setup and on-site moves, and use the same method every time so your rates are comparable. Record building type, method (ladder, water-fed pole, inside or outside) and conditions with each rate. After several jobs, you’ll have average rates for each job type that make quotes faster and more accurate. Keep a simple job log with panes, crew and hours. After ten jobs you’ll see clear patterns by building type.
What is the difference between panes per hour and minutes per pane?
They are two ways of stating the same thing. Twenty panes per labor-hour equals three minutes per pane, because 60 minutes divided by 20 panes is 3. The Commercial Window Cleaning Pricing Calculator uses minutes per pane, so convert your measured rate by dividing 60 by panes per hour. Note that if your measured rate already includes setup and access time, use a low access percentage in the pricing calculator to avoid counting that time twice. Write both forms on your price sheet so crews and estimators speak the same language. Check that the access allowance isn’t counted twice.
How do I forecast labor for a new window cleaning job?
Count the panes in the new job and divide by your measured rate for a similar job type. A 350-pane job at 20 panes per labor-hour takes 17.5 labor-hours. A two-person crew would need about 8.75 hours on site. Adjust if the new job differs from the one you measured, such as more height, heavier soil or interior cleaning. Use the forecast hours in the Commercial Window Cleaning Pricing Calculator with your labor rate, materials and travel to build the quote. Add a margin for unknowns on first-time jobs. Track actual hours to refine your rate.
Does crew size affect production rate?
The rate per labor-hour stays roughly the same as crew size changes, as long as the work can be split efficiently. Two workers each cleaning different sides of a building finish in half the clock time of one worker, with the same total labor-hours. On some jobs, extra workers help more, such as one handling setup while another cleans. On others they help less, such as when only one ladder position is safe. Measure rates with your usual crew size for the most accurate forecasts. Record crew size with each rate so comparisons stay fair.
Why should I track production rates by job type?
Different jobs have very different rates. Storefront glass, office interiors, residential windows, high windows needing ladders, and post-construction glass with paint and stickers all clean at different speeds. Using one average rate for all jobs overprices easy jobs and underprices hard ones. Tracking rates by type lets you quote competitively on easy work and charge enough for difficult work. Over time, comparing rates also shows whether new equipment or methods are improving productivity in the jobs you do most. Tag each job type in your records and filter by tag when quoting new work. Review the averages each quarter.
How does a water-fed pole change production rate?
Water-fed pole systems can raise production rates on exterior glass, especially on upper floors of low-rise buildings, by eliminating ladder setup and moves. Cleaners work from the ground, moving quickly from pane to pane. Very dirty glass or frames may still need extra attention. Measure rates separately for pole work and traditional ladder work. If pole work is much faster, you can price exterior glass more competitively and use the time saved to take on more jobs per day. Check filters and resin regularly so spot-free results stay consistent. Track the cost per job.
Should travel time be included in production rate?
Travel between job sites should not be included in a job’s production rate, because it varies by route and distance. Account for it separately as travel cost and time. Time spent moving between areas of the same building, such as walking around the building or moving between floors, is part of the job and can be included. Be consistent. The Cleaning Route Travel Cost Calculator handles travel between sites for route-based work such as storefront window routes. Keep travel in its own column on job records. Route-heavy days need it most when planning, so review drive time monthly.
How can I improve my crew's window cleaning productivity?
Common improvements include using the right squeegee width for the glass, water-fed poles for exterior upper-floor glass, efficient routes around the building, organized vehicles so crews find tools quickly, and training on technique. Regular service on recurring accounts keeps glass cleaner and faster to clean. Measure rates before and after changes to see the effect. Improvements in production rate lower cost per pane, which lets you win more competitive work or keep more margin on existing accounts. Introduce one change at a time so you can see which one helped. Share results with crews.
Can I use this calculator for other per-unit cleaning work?
Yes. Any task counted in units, such as light fixtures, vents, partitions, desks or chairs, can use the same method: units completed divided by person-hours gives units per labor-hour, and the next job’s units divided by that rate gives forecast hours. Rename the fields in your notes to match the task. This approach works well for repeated tasks in large facilities, where knowing units per hour helps schedule periodic work such as cleaning every light fixture or vent once a quarter. Keep each task’s rate labeled with the method used. Recheck rates when equipment changes.