Skip to content

PRACTICAL CLEANING GUIDE

How Many Day Porters Do You Need?

Quick answer: Multiply porter positions by coverage hours per day and days per week to get weekly coverage hours, then divide by the hours each employee actually works after leave and absences. Two positions covering 10 hours a day, seven days a week, need 140 hours, or 3.89 FTEs at 36 available hours each, so 4 employees.

Why aren’t positions the same as people?

A post covered 70 hours a week can’t be filled by one person working 40, and vacation and sick days widen the gap. Staffing to positions instead of hours leads to uncovered posts and overtime.

How do you calculate porter staffing?

Step 1. Find weekly coverage

Coverage = positions at the same time × hours per day × days per week.

Step 2. Find available hours per employee

Available = paid hours per week × availability %. Availability is the share of paid hours actually worked after leave, training and absences.

Step 3. Divide for FTE

FTE = coverage ÷ available hours.

Step 4. Round up for headcount

Employees = FTE rounded up. A part-timer can sometimes cover the fraction.

Example

Sample figures only.

ItemValue
Coverage (2 × 10 × 7)140 hours
Available per employee (40 × 90%)36 hours
FTE3.89
Employees4

What about breaks and weekends?

If the post must be covered during lunch, someone else covers it, which adds coverage hours. Seven-day coverage needs a rotating schedule so each porter gets days off; part-timers often cover weekends. Check break and overtime rules for your state or province before finalizing the schedule.

Plan your porter team

Use the Day Porter Staffing Calculator, then price the hours with the Day Porter Service Cost Calculator.

Make the numbers easier

Explore free calculators for cleaning time, staffing, bids and supplies.

Browse calculators

Explore all cleaning calculators

Find the right tool for bids, cleaning time, supplies, staffing and equipment.

Browse all calculators